SANITARY & STORMWATER PRECAST CONCRETE ORDER INFORMATION

CDS requires project drawings in order to complete a quote. These drawings are typically prepared by the architect or structural engineer. Drawing can be e-mailed, faxed or hardcopy mailed.

Typical turnaround time for quotes is 5-7 working days, depending on project size.

CDS requires (and will provide) shop drawings to be completed for all projects. No orders can be processed until approved shop drawings are received from the customer.

All customers shall be required to complete a CDS credit application before any orders can be submitted for production.

TERMS AND CONDITIONS OF SANITARY & STORMWATER PRECAST CONCRETE SALES:

  1. Quotes shall be valid for a period of no more than 30 days from the quote date.
  2. CDS Manufacturing, Inc. (CDS) reserves the right to amend our bid based on review of final approved shop drawings and/or changes in the scope of work.
  3. CDS shall make every effort to ascertain freight costs during the bidding phase of the project. CDS shall, at the end of the project, bill for the exact number of trucks required. This may result in an increase or decrease to the BUYER's final invoice.
  4. At the end of each month, CDS shall bill for completed and stored materials, regardless of delivery. Invoices for completed and stored materials are due 30 days from date of invoice. Any delays in payment may suspend production until payment is received. CDS shall not be responsible for any construction delays or back charges should construction be suspended due to BUYER late payments.
  5. CDS states that minor chips, abrasions and spall occur during handling and loading and do not require repair. Structural damage caused by CDS shall be repaired (or the component replaced) by CDS prior to loading. Any damage to the slabs subsequent to loading and removal from CDS is the responsibility of others.
  6. In order to assure prompt delivery, the BUYER is responsible for notifying CDS seven (7) days in advance of requiring delivery.
  7. CDS shall not accept responsibility for project delays or back charges resulting from circumstances beyond our control.

CONTRACT INCLUSIONS

  1. Supply sanitary & stormwater precast concrete in accordance with approved shop drawings.
  2. Signed and sealed shop drawings.
  3. Certificate of Insurance for stored materials.
  4. Sales Taxes (unless otherwise specified).
  5. Delivery.

CONTRACT EXCLUSIONS

  1. Installation.
  2. Rebar anchors, bearing pads, grout or other items used in installation.
  3. Filling of connections, embed plates, voids, knockouts, etc. unless specifically noted as required in the approved shop drawings.
  4. Testing and inspections.
  5. Cleaning of components prior to delivery.
  6. Fuel Surcharges (if applicable). Fuel charges may be assessed.

PAYMENT TERMS

  1. Terms of payment are 2% 10 days or Net 30 days from date of invoice.
  2. At the end of each month, CDS shall bill for completed and stored materials, regardless of delivery. Invoices for completed and stored materials are due 30 days from date of invoice.
  3. No retainage is accepted.
  4. Payment by BUYER to CDS is not contingent on BUYER'S receipt of money from third parties.
  5. Interest on any late payments shall accrue at the rate of 1½% per month